Wetlands Board
Tuesday, March 11, 2025
Minutes postedAgendaMinutes, Mar 11
Decided 6
All 6:Approved
- Fayette Associates, LP: construct 131 linear feet of timber bulkhead channelward of a deteriorated bulkhead and construct 55 linear feet of riprap sills (Yeocomico River)
Moved by Vanlandingham, seconded by Fisher
- Walter Hill: install 104 linear feet of riprap sill (Owen Pond)
Moved by Fisher, seconded by Vanlandingham
- Linda S. Morissette: construct 152 linear feet of timber bulkhead (Presley Creek)
Moved by Fisher, seconded by Vanlandingham
- Barrett G. Payne, III: install two (2) low-profile armor stone groins each 42 feet channelward of MHW, refurbish two (2) existing groin-like stone structures, and refurbish 160 linear feet of riprap sill (Chesapeake Bay)
Moved by Vanlandingham, seconded by Fisher
- Sylvia Sawyer: install 85 linear feet of riprap revetment (Prentice Creek)
Moved by Vanlandingham, seconded by Fisher
- Jonathan K. and Rosemary K. Williams: install 118 linear feet of riprap revetment (Lodge Creek)
Moved by Vanlandingham, seconded by Fisher
In the order of the minutes. Each quote opens the minutes where it’s written. Routine votes (approving the agenda and minutes, entering and leaving closed session, adjourning) aren’t listed.