Wetlands Board
Tuesday, August 11, 2026
Minutes posted September 15AgendaMinutes, Aug 11
Decided 7
All 7:Approved
- Scott B. Johnson: install 170 linear feet of bulkhead channelward of an existing bulkhead (Little Wicomico River)
Moved by Fisher, seconded by Rew
- Coan Hall Farm, LLC: install 104 linear feet of riprap revetment with a 16’ riprap spur and install 438 linear feet of riprap sill (Coan River)
Moved by Fisher, seconded by Vanlandingham
- David C. Harrison: remove a damaged timber groin and construct a replacement low-profile timber groin 48 feet from MHW (Judith Sound)
Moved by Fisher, seconded by Rew
- Walter H., IV and Jacquelyn N. Jones: construct 65 linear feet of riprap revetment channelward of an existing deteriorated timber bulkhead (Bridge Creek)
Moved by Vanlandingham, seconded by Rew
- Gary and Laura Lewis: install 289 linear feet of riprap revetment (Glebe Creek)
Moved by Vanlandingham, seconded by Fisher
- Eileen Tullner: repair 225 linear feet of existing riprap revetment and install 25 linear feet of riprap revetment (Prentice Creek)
Moved by Vanlandingham, seconded by Rew
- Penelope Weinheimer: install 195 linear feet of riprap revetment (Hull Creek)
Moved by Fisher, seconded by Rew
In the order of the minutes. Each quote opens the minutes where it’s written. Routine votes (approving the agenda and minutes, entering and leaving closed session, adjourning) aren’t listed.