Scott B. Johnson: install 170 linear feet of bulkhead channelward of an existing bulkhead (Little Wicomico River)

  1. Wetlands Board hearing (county’s record, Aug 11)Aug 11

  2. Wetlands Board decides (county’s record, Aug 11)Approved, unanimously · Aug 11

A step the records show opens the record itself.

About the Wetlands Board

In plain words

Scott B. Johnson asked the Wetlands Board for permission to install 170 linear feet of bulkhead channelward of an existing bulkhead.1 The work is along the shoreline of the Little Wicomico River and 160 Ferry View Drive.1 On June 9, 2026, the Board heard that the existing bulkhead was deteriorating, and members raised concerns about the two feet channelward.2 George Rew moved to table the project until the July 14, 2026, meeting so Mr. Johnson could submit revised drawings; Albert Fisher seconded and the Board unanimously approved.2 On August 11, 2026, the Board reviewed the revised plans and voted unanimously to approve the project for three years as shown on revised drawings dated August 6, 2026.3

Summarized from the county’s records, September 26.

Where each sentence comes from
  1. “Scott B. Johnson – to install 170 linear feet of bulkhead channelward of an existing bulkhead” … “along the shoreline of the Little Wicomico River and 160 Ferry View Drive”The matter as the records title it
  2. “he wished to construct 170 bulkhead channelward of an existing deteriorating bulkhead” … “the 2 foot channelward is a non-vegetated wetland impact” … “George Rew made a motion to table the project until the July 14, 2026, meeting so that Mr. Johnson could submit revised drawings of the project. Albert Fisher seconded the motion and the Board unanimously approved.”Jun 9, 2026 · Wetlands Board · In the minutes
  3. “Albert Fisher made a motion to approve the project for three years as shown on revised drawings dated August 6, 2026. George Rew seconded the motion and the Board unanimously approved.”Aug 11, 2026 · Wetlands Board · In the minutes

Written automatically from the county’s records. Each sentence has to quote the record it comes from, word for word, or it’s left out. The records have the final say.

The official wording

Application No. 26-0802 Scott B. Johnson – to install 170 linear feet of bulkhead channelward of an existing bulkhead along the shoreline of the Little Wicomico River and 160 Ferry View Drive.

Words the law defines

  • Wetlands board
    “‘Wetlands board’ or ‘board’ means a board created pursuant to § 28.2-1303.”

    Code of Virginia § 28.2-1300, Chapter 13. Wetlands

What’s happened

  1. Tue11Aug

    Wetlands Board · a vote

    ApprovedThe Board’s vote

    After the Board reviewed the revised drawing, Albert Fisher made a motion to approve the project for three years as shown on revised drawings dated August 6, 2026. George Rew seconded the motion and the Board unanimously approved.

    Moved by Fisher, seconded by Rew

    Minutes, Aug 11Open it in the meeting →

  2. Tue9Jun

    Wetlands Board · a vote

    TabledThe Board’s vote

    After reviewing the project and there being concerns and objections, George Rew made a motion to table the project until the July 14, 2026, meeting so that Mr. Johnson could submit revised… Show all

    Moved by Rew, seconded by Fisher

    Minutes, Jun 9Open it in the meeting →

Meeting by meeting, newest first, in the records’ own words. Each vote names the minutes it’s written in.

The records

Gathered from Northumberland County’s agendas, minutes and notices. Checked October 26.

Something wrong here?

If you know something on this page is wrong, say so. A person at County Voice reads each one. One that checks out is corrected here, with the date. The county’s and the state’s own records aren’t changed.

Never shown on the site, and not used for anything else.

Disagreeing with a decision isn’t a correction. To be heard on one, see what’s coming up.

How a wetlands permit is decided

Work in tidal wetlands and along the shoreline, such as riprap, bulkheads and sills, needs a permit. The county's Wetlands Board decides these applications after an advertised public hearing.

Applications are also filed with the Virginia Marine Resources Commission, which assigns the application number used to follow a request.

The law: Va. Code § 28.2-1302 (Adoption of wetlands zoning ordinance; terms of ordinance). This describes the general process, not this decision.